Thread: MyLists V1
View Single Post
  #6 (permalink)  
Old 03-17-2010, 10:10 PM
Simontelescopium Simontelescopium is offline
Junior Member
 
Join Date: Oct 2009
Location: London
Posts: 43
Default

V1.42 - For Specci48

I have added back in due dates on the tasks and note type on the tasks.

1) Due dates
- if selected in global options the due date (dd/mm) will be displayed on all tasks
- if a system icon is used and the task is overdue the system icon goes red (no change) but if a custom icon is used I show '!' like ToDoTree3.3

2) Task Type
- if a system icon isn't used and the global option is set I show a hint that there is a text or drawing (different character for each)

Get it here
Reply With Quote